Estimators assemble the same packet twice
The request, material specification, quantity and delivery need are spread across attachments and follow-up emails.
manufacturing workflow automation
SOORVO designs AI and workflow automation for manufacturing offices and job shops. Organize RFQs, drawing revisions and job-status communication while engineering, production and quality teams retain approval authority.
The operating reality
A request for quote can arrive with a drawing, a specification, a revised quantity and a promised follow-up file. Before estimating begins, someone needs to establish which documents belong to the request and what is still missing.
We would connect correspondence to the RFQ, job and approved revision. A later email should create a reviewable change, not silently replace the instructions for work already in production.
The request, material specification, quantity and delivery need are spread across attachments and follow-up emails.
Engineering knows about the change while purchasing or production still sees the previous job packet.
The office asks for updates that may already exist in job records, but without a clear approved message to send.
Example setup
The example turns an inbound request into cleaner estimating context without letting automation decide manufacturability, margin or the promised date.
A concrete configuration to picture — not a claim that every account exposes the same integration options.
01 / Request
A customer sends an RFQ, drawing, repeat-order request or purchase-order question.
02 / SOORVO
Capture the request, preserve the source files and known part context, and prepare the estimator’s next task.
03 / JobBOSS²
Use the JobBOSS² path available to the shop for the permitted quote, order, document or job-context handoff.
04 / Human ownership
The estimator or planner owns manufacturability, pricing, routing, material decisions, capacity and delivery commitments.
Illustrative configuration. JobBOSS² is shown as a recognizable example, not as a SOORVO partner or a fixed stack. Exact automation depends on the vendor capabilities, account tier, permissions and integration access available to the customer.
Want to see this mapped against the tools and handoffs you already use?
Discuss your systemsFits the tools you already use
The existing ERP, job tracker and document process set the integration requirements. We assess their identifiers and approval states before automating movement between them.
Our approach to technology & integrationsRFQs, jobs, purchasing dependencies and approved milestones.
Before connectingCan part, job and revision identifiers be linked without confusing similar records?
Original drawings, proposed changes and released specifications.
Before connectingCan proposed and approved revisions remain distinct, with access appropriate to the material?
Clarifications, change requests and approved progress communication.
Before connectingCan a message reference its source job and documents without exposing another customer’s files?
Build the boundary, too
Decide who can approve, change or override an action before the workflow goes live.
Automation can organize supplied specifications. It does not approve tolerances, material substitutions, process plans or manufacturability.
These examples do not write CNC programs, change machine settings or replace safety controls.
Identify contractual and data-access restrictions before selecting tools. Do not send drawings or customer specifications to an unapproved service.
How SOORVO approaches the build
Start where the office loses context, then test the proposed handoff with estimating, engineering, planning and quality.
Implementation, management & usageAgree where RFQ, part, job and released-revision records are authoritative.
Test a revised drawing, a superseded attachment, a job hold and a repeated customer request.
Require the relevant owner to accept a change before dependent work proceeds.
Before you scope a project
The proposed workflow would associate the RFQ, part reference and supplied drawing revision before preparing an estimator’s review. A later attachment should flag affected work for review, not silently replace the released drawing. Engineering approves the effective revision; the team retains feasibility, pricing and production-release decisions. This is office coordination, not machine control.
The scope shown is the digital office around the job: intake, documents, approvals and communication. Machine control and safety-critical production logic require a separate, qualified engineering scope.
We are not promising autonomous estimating. A useful first step is organizing the RFQ and identifying missing information so your estimator can make the technical and commercial decisions.
We can assess a bounded workflow around the current process. Before any automation writes data, we need clear record identifiers, ownership, access and a way to recover from conflicting edits.
NIST’s digital-thread discussion describes the challenge of exchanging design and manufacturing information accurately. The workflows here apply that concern to office records and approvals.
Start with the work
Bring the request, the tools it touches and the decision your team needs to keep.